The honest check

Can you DIY this?

Tick everything that applies. The verdict is not about confidence; it is about whether the job has a hard stop in it. A pro is not a failure. A second attempt is.

This checklist works without JavaScript: every item and every stop sign is visible. The verdict panel is the enhancement.

Without the script

How to read your answers.

Any item marked Stop means call a pro before you buy materials. Not because you are incapable, but because the job involves asbestos, water, structure or a wet area, and those are not flooring problems.

Three or more unmarked items means slow down and plan. Two or fewer means you are probably in good shape, provided the subfloor is flat and the carton instructions match what you are about to do.

The one rule that matters

If you are unsure about asbestos, stop. Do not sand, scrape, pry or vacuum anything until a sample has been tested. Everything else on this page can be fixed. That one cannot be undone.

The questions

The four we hear most.

Can I lay laminate over a concrete floor?

Usually yes, if the slab is flat, dry and covered with the vapour barrier the flooring manufacturer specifies. Test for moisture first: tape a plastic sheet down for 24 hours and look for condensation. If the slab is damp, the floor needs a barrier or a different system before anything goes on top.

Do I need a pro to remove old vinyl tile?

If there is any chance the tile, backing or adhesive contains asbestos, yes. Get a sample tested before you scrape, sand or pry anything. Disturbing asbestos is a health problem, not a flooring problem, and it is not a job for a weekend.

Can I tile over existing tile?

Sometimes, but it is not a beginner shortcut. The existing tile has to be sound, clean, flat and properly bonded, and the added height affects transitions, door clearances and fixtures. If any tile is loose or the floor deflects, remove it.

How long does a DIY floor take?

A normal room is usually a long day for the floor and another half-day for trim, once the planks have acclimated. Add time for the first row, the door jambs and the last row. If you have never done it, double the estimate rather than the caffeine.